MISC - YANAGAWA Yoshinari
-
柳川 佳也, 宮崎 茂次
生産管理 7 ( 2 ) 193 - 196 2001.1
-
Optimization of physical distribution and facility location in consideration of environmental problem based on "Modal Shift" for importation
Y Wakabayashi, Y Yanagawa, S Miyazaki
ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT 48 - 53 2000
-
Mixed-model assembly line scheduling in consideration of idle time and line stops
K Kurashige, Y Yanagawa, S Miyazaki, Y Kameyama
ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT 91 - 96 2000
-
Sequencing method for products in consideration of assembly time
Kenji Kurashige, Yanagawa Yoshinari, Shigeji Miyazaki, Yoshimasa Kameyama
International Journal of Production Economics 60 565 - 573 1999.4
-
Sequencing method for products in consideration of assembly time
Kenji Kurashige, Yanagawa Yoshinari, Shigeji Miyazaki, Yoshimasa Kameyama
International Journal of Production Economics 60 565 - 573 1999.4
-
Sequencing method for products in consideration of assembly time
K Kurashige, Y Yanagawa, S Miyazaki, Y Kameyama
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS 60-1 565 - 573 1999.4
-
新しい目的関数に基づく組立時間を考慮した製品の投入順序決定法
倉重賢治, 柳川佳也, 宮崎茂次, 亀山嘉正
日本経営工学会論文誌 1999
-
Sequencing Method for Products in Consideration of Assembly Time Based on New Objective Function
KURASHIGE Kenji, YANAGAWA Yoshinari, MIYAZAKI Shigeji, KAMEYAMA Yoshimasa
Journal of Japan Industrial Management Association 49 ( 6 ) 384 - 392 1999
-
Multiple Objectives Scheduling with JIT Theory in a Flow Shop FMS
KAWTUMMACHAI Ruengsak, YANAGAWA Yoshinari, OHASHI Kazumasa, MIYAZAKI Shigeji
Transactions of the Japan Society of Mechanical Engineers. Series C. 64 ( 627 ) 4519 - 4524 1998.11
-
Mixed-Model Assembly Line Scheduling in Consideration of Assembly Time
KURASHIGE Kenji, YANAGAWA Yoshinari, MIYAZAKI Shigeji, KAMEYAMA Yoshimasa
Transactions of the Japan Society of Mechanical Engineers. Series C. 64 ( 624 ) 3238 - 3245 1998.8
-
Application of Branch and Bound Method in Divided Line Balancing Problem
KURASHIGE Kenji, YANAGAWA Yoshinari, MIYAZAKI Shigeji
32 ( 2 ) 137 - 143 1998.6
-
OSAKADA Takafumi, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Journal of Japan Industrial Management Association 49 ( 5 ) 293 - 302 1998
-
WANGWIWATSIN Porndech, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Transactions of the Japan Society of Mechanical Engineers. Series C. 63 ( 610 ) 2181 - 2188 1997.6
-
Application of Backward Scheduling Rules in JIT/FMS Environment
KAWTUMMACHAI Ruengsak, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Transactions of the Japan Society of Mechanical Engineers. Series C. 62 ( 600 ) 3371 - 3377 1996.8
-
Application of Branch and Bound Method Method in Divided Line Balancing Problem
KURASHIGE Kenji, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Journal of the Japan Society for Precision Engineering 62 ( 5 ) 691 - 695 1996.5
-
Layout Method for Grouping Locations with Same Relation of Distances
NAGAKI Jiro, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Transactions of the Japan Society of Mechanical Engineers. Series C. 62 ( 595 ) 1204 - 1209 1996.3
-
Scheduling for Parallel Machines with Different Efficiencies
YANAGAWA Yoshinari, MIYAZAKI Shigeji, HIRAKATA Satoshi, TERADO Nobuyuki
Transactions of the Japan Society of Mechanical Engineers. Series C. 62 ( 595 ) 1156 - 1162 1996.3
-
WANGWIWATSIN Porndech, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Journal of Japan Industrial Management Association 47 ( 2 ) 84 - 90 1996
-
比較かんばん方式における定期・定量引き取り方式の優位性に関する研究
中島 丈温, 柳川 佳也, 宮崎 茂次
日本経営工学会誌 45 ( 6 ) 604 - 604 1995
-
Operation Planning of MRP/JIT Method for Rarely Withdrawal Parts
NAKAJIMA Takeharu, YANAGAWA Yoshinari, MIYAZAKI Shigeji
Journal of Japan Industrial Management Association 46 ( 4 ) 284 - 290 1995